-40%

Hydro Power Turbine Generator Micro 5000w 5KW Single Three Phase Pelton Turbine

$ 2006.39

Availability: 100 in stock
  • Current Rating: 21-30 A
  • Wattage: 5000-5999 W
  • Refund will be given as: Money back or replacement (buyer's choice)
  • Current Type: AC
  • Power Source: Water
  • Maximum Input Voltage: Greater Than 200 V
  • Number of Blades: 6
  • Features: All Daylight Conditions
  • Color: Green
  • Power: Greater Than 2000 W
  • Axis Orientation: Horizontal
  • Current Output: 20-29 A
  • Resistance Properties: Abrasion Resistant
  • Type: Pelton Turbine
  • Application: Agriculture/Farming
  • Inverter Technology: Central
  • Condition: New
  • Country/Region of Manufacture: China
  • System Configuration: Hybrid
  • Material: stainless steel
  • Recommended Environment: Outdoor
  • All returns accepted: Returns Accepted
  • Custom Bundle: Yes
  • Brand: Unbranded
  • Charging Mode: MPPT (Maximum Power Point Tracking)
  • Voltage: 230V , 400V
  • Return shipping will be paid by: Buyer
  • Item must be returned within: 30 Days

    Description

    Hydro Power Turbine Generator Micro 5000W 5KW Single Three Phase Pelton Turbine
    Power: 5000W three phase 400v, 230v single phase
    Flow: 0.035m3 / s Head: 15-40m
    Water pipe with a valve 75mm, 90mm with no
    The water-rich region is home to small-scale hydroelectric power of choice, because it is issued by the 220v electricity, it does not require batteries and inverters, low cost, and voltage stability. Such generators are used oblique Direct hit turbine units ready permanent magnet synchronous single-phase alternators thereof. Small size, light weight, simple structure, reliable operation, easy installation, etc., the most suitable to have isolated mountain farmers minute water resources to solve power plant lighting, television, etc. electricity. Turbines and generators have been strengthened to deal, reliable, stable performance, women and children may be operating characteristics for farmers since the purchase, self, self-management, self-use. Users only need to be able to supply less investment to add to your family happiness and joy.
    "Ramp-machine" adopts new inclined tube nozzles, with large and small caliber, to improve the efficiency of the turbine. Set separation between motor and turbine bearing section, waterproof, greatly improving the life of the unit, eliminating the main drawbacks of the oblique attack aircraft, to achieve high quality.
    Ramp-style small hydroelectric or called ramp-style mini-hydroelectric
    Using a simple spoon blade turbine composed by the housing, a nozzle, an impeller, and a generator, whose design is extremely simple, when a high-speed flow from the nozzle toward the blade, high-speed rotating blade, so as to drive generators. Because of its simplicity, small size, light weight, simple structure, reliable operation, easy installation characteristics, most suitable for mountain farmers have slight water resources solution sporadic power plant lighting, television, etc. electricity.
    Ramp-type turbine generator units belonging to traffic generators of small high head, head range is generally applicable 5
    -70
    Meter. Its working principle is: the jet from the nozzle is not out tangentially, but along the plane of rotation of the wheel in a direction at an angle from the side of the wheel into the bucket, and then leave the other side bucket.
    Our main production
    0.3KW-100KW
    Small hydro-generating unit, install the following picture:
    Installation Instructions
    1, installation requirements: turbine planar contact with the base bottom plane tight seamless, neither the contact surfaces so that the tail water splashes, without leaking outwardly.
    2, the installation program: After the concrete poured has set the basis for the curing, the unit installation position, and then sequentially watering. Measuring the level of the scale must be horizontal when the unit is installed, to ensure that the unit is fixed in a horizontal position. Horizon unit and plugging gaps with cement, does not allow water leakage. After the installation unit, then a check and hand turn rotates the turbine shaft, such as flexible and movable, even if the unit is installed.
    3, the basic requirements of the installation of the pipe: pipe diameter The pipe unit purchase requirement, high drop pipe diameter can be reduced. Pipeline straight to minimize bending, pipeline and horizontal angle of not less than 25 degrees, or pipeline growth, large head loss, resulting in insufficient electricity and other consequences, to install the pool wall in front of Intake pipe with most, if flare, its lower edge from the bottom plane is not less than 0.2 m, an inner diameter of the joint should be equal, in order to reduce head loss, should be minimized linker.
    4, the installation of the steel pipe: a multi-micro hydro flange welded steel pipe, be sure to let timing
    flange mounting pads, so as to reduce the flow section, the union nuts Yaoan diagonal order progressively tighten.
    5, anchor block: water in the pipe joint and the turbine nozzle, the maximum pressure on the pipe, it is necessary to build a stone or concrete anchor block, a metal tube is fixed.
    6, buttress: a metal pipe by its own weight and water weight, easy bending deformation pipe is too long, it must be added in the middle buttress. Position is preferably disposed at the branch pipe joint of the duct.
    Verifying Installation
    1, check the pipe and fittings for leaks. If you find there is leakage, you should analyze the reasons for timely treatment.
    2, obstruction of dirt left behind by the installation of the pipeline, to be cleaned to ensure the water flow.
    3, the pressure receiving water pipe inspection, whether modified or inflection, the support is solid. If the event is not a normal phenomenon, it should be timely.
    Valve installation
    A valve mounted on the water pipe, close to that end of the unit, or about 1 meter from the nozzle is mounted directly on the nozzle, as the case may be. Micro hydro valve diameter pipe diameter should be consistent, the choice of gate or ball must not use valves, since the choice of cut-off valve to reduce the flow section will affect turbine output.
    Valve installation must pay attention to two points:
    1, the centerline of the tail shaft and turbine runner watercourse must remain the same vertical line.
    2, flange pad to pad positive fastening bolt connection, so as to reduce possible head loss, but also to prevent leakage.
    engine room
    Room microturbine group of civilian houses can be built, the room should be ventilated to ensure the house does not leak, not water seepage. An area size of the visual unit, the unit to the wall distance not less than 0.8 m, so convenient installation, operation and maintenance operations.
    debugging
    Check before the test machine. After the micro-hydro installation before commissioning, it must be checked. Check the contents include a review of the quality of the installation, inspection of micro hydropower units and electrical systems and other aspects.
    Inspection of the quality of the installation
    1, drains, water pipes should be no leakage, the intake should be free of obstructions fences, flexible valve should open and close;
    2, the water level of the pool to keep the water level design;
    3, should drain reclosable;
    Inspection of micro hydropower units and electrical systems
    1, the control key generator housing cover open, the contact with the slip ring brush inspection is good;
    2, each of the mechanical connector should be no loose fasteners;
    3, the wheel rotation should be flexible, without shaking, the same sound, each of the rotating parts should be added a little oil.
    4, with a reliable electrical connection, the total load does not exceed the electricity generator rated power. Or connected with a power transfer device equipped with a mechanical regulator device unit may temporarily take the load, but must transfer requires electrical wiring or mechanical regulator device securely sensitive.
    Commissioning
    Slowly open the floodgates turn on the water, promoting water wheel rotations, the generator voltage will slowly rise to the rated voltage. Note :( user must take the valve means to open the valve to its maximum position) if the maximum power generation amount of more than 20% of the rated power generation of the unit, a small amount of water should be off, the maximum power generation amount was adjusted to 105% of rated power generation amount can, to prevent the crew work long hours under overload state. Try again if power generation is less than the designed capacity, the mouth should be checked before the pool water flooded the adequacy of depth, with or without the cyclone, water conduit clogging, whether the unit is running jamming and friction and so on, and troubleshoot problems.
    parking
    First ends of each consumer load shed, gates opened, then closed the shutter. Permanent magnet motor should be off the turbine sluice, and then opened the gates
    Payment:
    1.
    We accept PayPal only.
    2.
    All major credit cards are accepted through secure payment processor PayPal.
    3.
    Payment must be received within 7 business days of auction closing.
    4.
    We ship to your eBay address. Please make sure your eBay and PayPal address Is correct before you pay.
    Delivery:
    1.
    Items will be sent out in 48 hours after the payment in working days (Monday-Friday) to international shipping.
    2.
    As international shipping is affected by many unsteady factors: customs, flights, weather, war, trade policy, etc., some shipments do get delayed sometimes. If you have not received your shipment within 30 days from payment, please contact us. We will track the shipment and get back to you as soon as possible with a reply. Our goal is customers' satisfaction!
    3.
    Besides, we've got another much faster shipping method which usually only takes 4-8 working days for arrival. But extra shipping fee has to be paid by buyers.  If the faster shipping way is needed, please email us as soon as you've ordered the items.
    Return:
    1.
    If for any reason, you are not satisfied with the item, you can return it in the original package within 30 working days after receiving the item.  Please contact us first for further information.
    2.
    However, as every sale is final, we appreciate your reconsideration for any return. Thank you again for your business.
    Feedback:
    1.
    We strive for 100% customer satisfaction! Positive Feedback is very important to us.
    2.
    If you have any questions, please feel free to contact us via "Contact Seller”, we will reply to your email within 24 Working hours.